Commercial solar and battery storage built around your facility.

Smarter Power helps Ontario businesses evaluate, design and deploy commercial solar PV and battery energy storage systems around real utility data, site constraints and financial objectives.

See How We Assess a Project
✓ Utility-bill & interval-data review ✓ Solar + storage modelling ✓ Incentive & tax-credit guidance ✓ Financing options

Final savings, project economics, incentive eligibility and interconnection requirements depend on the facility, utility, operating profile, equipment selection and applicable program terms.

COMMERCIAL ENERGY ARCHITECTURE ONTARIO
Solar PV Generate on-site
Battery Storage Shift & manage energy
Utility Grid Coordinate site demand
PROJECT APPROACH Utility-aware Designed around service capacity, LDC requirements and facility load.
FINANCIAL MODELLING Data-driven Recommendations based on consumption, demand, operating hours and project goals.
SYSTEM STRATEGY Scalable Solar, battery storage and electrification can be phased as your facility evolves.
PROJECT SUPPORT End-to-end Assessment, design coordination, approvals, installation and commissioning.
BUSINESS CASE

Energy infrastructure should support the economics of the business.

Commercial projects are not sized from roof area alone. The strongest projects align generation, storage and controls with the facility's actual electrical profile, operating schedule, utility tariff and capital plan.

01
↘
Reduce purchased electricity

Use on-site solar generation to offset a portion of facility consumption during productive daylight hours.

02
⌁
Manage peak demand

Battery storage can be evaluated for peak shaving, load shifting and demand-management strategies where the tariff and load profile support it.

03
▣
Improve resiliency

Storage and controls can support selected critical loads when a project is designed with backup operation and isolation requirements in mind.

04
$
Plan capital strategically

Incentives, refundable tax credits and financing can materially change project cash flow when the project and claimant qualify.

COMMERCIAL ENERGY SOLUTIONS

Build the project around the load, not around a product.

Smarter Power can evaluate individual technologies or an integrated energy strategy depending on the facility's priorities.

02 ENERGY STORAGE

Battery Energy Storage

Battery systems can be modelled around demand peaks, operating schedules, critical loads and the facility's broader energy strategy.

  • Peak-shaving analysis
  • Load shifting and time-of-use strategy
  • Critical-load resiliency planning
  • Controls and operating-mode design
03 INTEGRATED SYSTEM

Solar + Battery Storage

Pair generation and storage to increase on-site solar utilization, improve operating flexibility and build a more coordinated facility energy system.

  • Solar-to-storage energy flow modelling
  • Non-export / load-displacement strategies
  • Operational setpoint development
  • Scalable system architecture
04 ELECTRIFICATION

EV & Facility Electrification Planning

Future EV charging, heat pumps and process electrification can materially change a site's load. Planning them together can reduce expensive redesign.

  • Service-capacity review
  • Future load allowance
  • Charging and energy-management planning
  • Phased infrastructure strategy
COMMERCIAL ENERGY ANALYSIS

The utility bill tells only part of the story.

Good commercial system design requires understanding when the facility uses electricity, how high the demand peaks, what equipment drives those peaks and how the site interacts with the utility.

01 Energy consumption

Historical kWh usage, seasonal patterns and operating hours help determine how much solar production can realistically be consumed on site.

02 Peak demand

Interval data and demand charges help determine whether battery peak shaving or operational changes warrant deeper modelling.

03 Electrical infrastructure

Service voltage, transformer capacity, switchgear, available breakers and connection points influence system design and project cost.

04 Site constraints

Roof condition, structural capacity, available area, equipment placement, access and fire-code clearances need to be resolved early.

05 Utility requirements

The local distribution company determines connection requirements, allowable capacity and any studies or protection requirements.

06 Financial objective

Payback, cash flow, tax position, available incentives, financing and resiliency goals can lead to very different system recommendations.

OUR PROJECT PROCESS

From utility data to an installable commercial project.

Our process is designed to resolve feasibility and economics early, before the project advances into detailed engineering, approvals and construction.

01 Facility & Utility Review

We review your business objectives, electricity bills, interval data, operating schedule and known site constraints.

02 System & Financial Modelling

We model solar generation, storage use cases, utility interaction, projected savings and relevant funding pathways.

03 Engineering & Approvals

The project advances through electrical/structural requirements, LDC connection steps, permits and incentive pre-approval where applicable.

04 Installation & Commissioning

Equipment is installed, inspected, commissioned and configured around the approved operating strategy and project requirements.

Commercial projects are site-specific. Final scope may involve the LDC, ESA, municipal permits, structural review, electrical engineering, incentive administrators and tax professionals.
INCENTIVES · TAX CREDITS · FINANCING

Capital structure can materially change project economics.

Smarter Power can identify relevant program pathways and coordinate project documentation. Tax-credit eligibility and tax treatment should be confirmed with the business's professional tax advisor.

SAVE ON ENERGY · SOLAR DER $770/kW-AC

Small / medium commercial solar

The current Save on Energy Retrofit Solar DER incentive lists $770/kW-AC for eligible small/medium generation solar projects above 10 kW and up to the program's applicable capacity limit.

  • Designed for load-displacement projects
  • Pre-approval is required before eligible project completion
  • Program caps, eligible-cost limits and technical rules apply
Review Save on Energy ↗
FEDERAL CLEAN TECHNOLOGY ITC Up to 30%

Refundable clean-technology tax credit

Eligible solar electricity-generation equipment and fixed-location electrical energy storage can qualify as clean technology property under the federal Clean Technology Investment Tax Credit.

  • Claimant and property eligibility requirements apply
  • Labour requirements affect the maximum credit rate
  • Professional tax advice is recommended before relying on the credit
Review CRA guidance ↗
COMMERCIAL FINANCING Flexible capital

Financing through Merchant Growth

Smarter Power works with Merchant Growth to provide businesses with a financing pathway that can help align project investment with operating cash flow and energy savings.

  • Business-financing application pathway
  • Useful for qualifying commercial solar projects
  • Financing approval and terms are determined by the lender
Explore financing ↗
Program amounts, eligibility rules, tax-credit requirements and lender terms can change. Final approval is determined by the applicable program administrator, tax authority, utility or lender.
LOAD DISPLACEMENT VS. EXPORT

Commercial solar should be designed around how the facility actually consumes energy.

Ontario's current Save on Energy Solar DER incentive is structured around load displacement. That means solar is evaluated primarily for energy consumed at the facility rather than as a project built around selling excess generation.

Why it matters: A system that regularly produces more than the facility can use may have different economics, interconnection requirements and program eligibility.
ILLUSTRATIVE FACILITY PROFILE DAYTIME
Facility load
Solar production
Facility load Solar production
Illustration only. Actual system sizing requires site-specific interval data and production modelling.
COMMERCIAL · INDUSTRIAL · INSTITUTIONAL

A practical fit for facilities with meaningful daytime electrical demand.

The value proposition varies by load shape, roof/site conditions, tariff, capital structure and operating priorities.

WAREHOUSING Distribution & logistics

Large roof areas, daytime operations, material handling and future fleet electrification.

MANUFACTURING Industrial facilities

Process loads, demand peaks, long operating hours and energy-intensive production.

RETAIL Commercial properties

Daytime load, HVAC demand, refrigeration, lighting and customer-facing sustainability goals.

AUTOMOTIVE Dealerships & service centres

Large roofs, daytime electricity demand and growing EV-charging requirements.

OFFICE Corporate & professional

Predictable weekday loads, HVAC demand and long-term operating-cost planning.

INSTITUTIONAL Community facilities

Schools, non-profits and other facilities evaluating energy and resilience investments.

PREPARE FOR A COMMERCIAL ASSESSMENT

A few documents can make the first review significantly more useful.

You do not need to have everything available before contacting us. These items simply help us move from a high-level conversation to a meaningful project assessment faster.

01 12 months of electricity bills
02 Interval / Green Button data if available
03 Facility address and operating hours
04 Electrical service / one-line information
05 Roof plans, drawings or site plans if available
06 Your financial and operational objectives
COMMERCIAL SOLAR & STORAGE FAQ

Questions decision-makers usually ask first.

How do you determine the right commercial solar system size?
We start with the facility's historical electricity use, interval data where available, operating schedule, roof or site constraints, electrical service and utility connection requirements. For load-displacement projects, the goal is generally to align solar production with energy that can be consumed by the facility rather than simply maximize panel count.
When does battery storage make sense for a business?
Battery storage can be valuable when the facility has significant demand peaks, time-sensitive electricity costs, critical-load requirements or a need to increase on-site use of solar generation. The business case should be modelled from the site's actual load profile rather than assumed from building size alone.
Can a commercial solar project receive the Save on Energy incentive?
Eligible load-displacement solar projects may qualify under the Save on Energy Retrofit Solar DER stream. Current program materials list a $770/kW-AC incentive for eligible small/medium generation projects, subject to program capacity, cost, technical and pre-approval requirements. Program terms should be confirmed before project commitments are made.
Can solar and battery storage qualify for the federal Clean Technology ITC?
Certain solar electricity-generation equipment and fixed-location electrical energy storage can qualify as clean technology property. The federal Clean Technology ITC can provide a refundable credit of up to 30% for eligible property, depending on the claimant, timing and labour requirements. Businesses should confirm tax treatment with their professional tax advisor.
Is load displacement the same as net metering?
No. Load displacement focuses on using solar production to reduce electricity purchased for the facility's own load. Net metering is a separate utility arrangement that can account for exported generation. The current Save on Energy Solar DER incentive is designed around load displacement, so the project structure and utility arrangement should be reviewed early.
What approvals are typically involved?
Requirements depend on the project and municipality, but commercial projects may involve the local distribution company, ESA, municipal permits, structural review, engineering documentation and program pre-approvals. Larger or more complex projects can require additional connection studies and protection requirements.
Do you offer financing for commercial projects?
Smarter Power works with Merchant Growth to provide a business-financing pathway for qualifying commercial projects. Financing approval, rates, terms and available amounts are determined by the lender.
What does Smarter Power need to start an assessment?
A facility address, recent electricity bills and a short discussion about operating hours and project goals are enough to begin. Interval data, electrical drawings, roof plans and site drawings can be added as the assessment advances.
START WITH THE FACILITY DATA

Build a commercial energy project you can defend in a boardroom.

Request a commercial assessment and Smarter Power will review your facility, utility usage, project objectives and available solar, storage, incentive and financing pathways.

Call 1 888 890 3335

Program and tax information is provided for general project-planning purposes. Final eligibility and tax treatment are determined by the applicable program, utility, tax authority and the business's professional advisors.